Trimountain Mine, Plan Details of the Number 3 Concrete Shaft Collar (2 of 2)

Image

Cite this

“Trimountain Mine, Plan Details of the Number 3 Concrete Shaft Collar (2 of 2)”. Paper. Trimountain Mine. Adams Township. Accessed November 7, 2024. https://uplink.nmu.edu/node/34608.

Share