Backstay span for Mackinac Bridge (13 of 14)
Abstract/Description: | The backstay span, going from anchor pier to cable bent, was delivered to the site by barge, and moved into position. Once in proper location, the barge was partially sunk allowing the truss to settle down onto its fastenings. |
---|---|
Subject(s): | Bridges--Design and construction St. Ignace (Mich.) Mackinaw City (Mich.) Mackinac Bridge (Mich.) |
Date Created: | 1957 (approximate) |
Title: | Backstay span for Mackinac Bridge (13 of 14). |
|
---|---|---|
Name(s): |
Superiorland Library Cooperative, contributor Mackinac Bridge Authority, contributor |
|
Type of Resource: | still image | |
Date Created: | 1957 (approximate) | |
Physical Form: | photographs | |
Extent: | 1 item | |
Abstract/Description: | The backstay span, going from anchor pier to cable bent, was delivered to the site by barge, and moved into position. Once in proper location, the barge was partially sunk allowing the truss to settle down onto its fastenings. | |
Note(s): |
Electronic reproduction of text. The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority |
|
Subject(s): |
Bridges--Design and construction St. Ignace (Mich.) Mackinaw City (Mich.) Mackinac Bridge (Mich.) |
|
Held by: | Superiorland Library Cooperative | |
Restrictions on Access: | In copyright (http://rightsstatements.org/vocab/InC/1.0/) | |
Is Part Of: | Mackinac Bridge Authority photographs. Identifier: SLC-011 | |
In Collections: |