Mackinac Bridge looking finished (5 of 6)

Much to be done.  Roadways go from shore to anchor piers but the roadway deck remains to be installed on the suspension spans., Electronic reproduction of text.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: Much to be done. Roadways go from shore to anchor piers but the roadway deck remains to be installed on the suspension spans.
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1957 (approximate)