Welding the deck of the Mackinac Bridge (7 of 7)

Welders work in securing the open grid deck to the stringers below while pavers continue on the outside driving lanes., Electronic reproduction of text.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: Welders work in securing the open grid deck to the stringers below while pavers continue on the outside driving lanes.
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1957 (approximate)