Finishing up the anchor piers for the Mackinac Bridge (5 of 7)

Pre-cast concrete slabs are placed over the cable splay chamber.  These slabs are the roof for the chamber where all the suspension cables attach to the anchor bars., Electronic reproduction of text.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: Pre-cast concrete slabs are placed over the cable splay chamber. These slabs are the roof for the chamber where all the suspension cables attach to the anchor bars.
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1957 (approximate)