Finishing up the anchor piers for the Mackinac Bridge (4 of 7)

The anchor pier deck was made up of 13 ton per-cast concrete slabs.  These were poured ashore and set in place in October of 1957., Electronic reproduction of text.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: The anchor pier deck was made up of 13 ton per-cast concrete slabs. These were poured ashore and set in place in October of 1957.
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1957 (approximate)