Concrete at the Mackinac Bridge anchor pier (6 of 6)
Abstract/Description: | Concrete is placed in the lower areas of the anchor piers using tremmies (elephant trunk). This is a hopper/funnel device with a hose attached used to place materials where desired by gravity. Once these areas had served their purpose they were filled with concrete. This will contribute to the calculated mass (weight) as engineered to support the suspension bridge. |
---|---|
Subject(s): | Bridges--Design and construction St. Ignace (Mich.) Mackinaw City (Mich.) Mackinac Bridge (Mich.) |
Date Created: | 1957 (approximate) |
Title: | Concrete at the Mackinac Bridge anchor pier (6 of 6). | |
---|---|---|
Name(s): |
Superiorland Library Cooperative, contributor Mackinac Bridge Authority, contributor |
|
Type of Resource: | still image | |
Date Created: | 1957 (approximate) | |
Physical Form: | photographs | |
Extent: | 1 item | |
Abstract/Description: | Concrete is placed in the lower areas of the anchor piers using tremmies (elephant trunk). This is a hopper/funnel device with a hose attached used to place materials where desired by gravity. Once these areas had served their purpose they were filled with concrete. This will contribute to the calculated mass (weight) as engineered to support the suspension bridge. | |
Note(s): |
Electronic reproduction of text. The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority |
|
Subject(s): |
Bridges--Design and construction St. Ignace (Mich.) Mackinaw City (Mich.) Mackinac Bridge (Mich.) |
|
Held by: | Superiorland Library Cooperative | |
Restrictions on Access: | In copyright (http://rightsstatements.org/vocab/InC/1.0/) | |
Is Part Of: | Mackinac Bridge Authority photographs. Identifier: SLC-011 | |