Suspender ropes for the Mackinac Bridge (7 of 9)

Once the main cables were completed, the catwalk was secured to the suspension cables and the cables used to hold up the catwalk were removed and cut to the proper length for the suspender ropes then rolled onto spools and labeled for their particular location., Electronic reproduction of text.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: Once the main cables were completed, the catwalk was secured to the suspension cables and the cables used to hold up the catwalk were removed and cut to the proper length for the suspender ropes then rolled onto spools and labeled for their particular location.
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1957 (approximate)