Cable wire for Mackinac Bridge

The 32,000 lb. Reel of wire was shipped by rail to St. Ignace and was unloaded by crane for delivery to the anchor pier where it would be unrolled during the cable spinning process, Electronic reproduction of text.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: The 32,000 lb. Reel of wire was shipped by rail to St. Ignace and was unloaded by crane for delivery to the anchor pier where it would be unrolled during the cable spinning process
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1956 (approximate)