Mackinac Bridge construction, Winter 1956 (4 of 6)

Materials are assembled and adjusted to make them ready for the coming construction season., Electronic reproduction of text.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: Materials are assembled and adjusted to make them ready for the coming construction season.
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1955-12