Cable bent pier for Mackinac Bridge (1 of 15)

Crews rush to finish work on the foundation of pier No. 18, the south cable bent pier, before winter forces them to stop work until spring., Electronic reproduction of photograph.  The Mackinac Bridge 1954 - 1958. Mackinac Bridge Authority
Abstract/Description: Crews rush to finish work on the foundation of pier No. 18, the south cable bent pier, before winter forces them to stop work until spring.
Subject(s): Bridges--Design and construction
St. Ignace (Mich.)
Mackinaw City (Mich.)
Mackinac Bridge (Mich.)
Date Created: 1954 (approximate)